FREE 28-PAGE GUIDE

Stop guessing your reorder point

The playbook 400+ D2C brands used to cut stockouts in half without tying up cash in dead inventory.

  • How to set a reorder point that isn't a guess
  • The 3-week buffer rule for Indian freight lead times
  • A free spreadsheet to run the math yourself

Takes 45 seconds. Delivered straight to your inbox.

The D2C Reorder Playbook — 28-page guide, ready to read

Get your free copy

Enter your email and we'll send the PDF right away.

Email address
you@example.com
Subscribe

What's inside

  • Chapter 1 — Why reorder points fail at scale
  • Chapter 2 — The 3-week freight buffer rule
  • Chapter 3 — A demand forecasting cheat sheet
  • Chapter 4 — The reorder spreadsheet (included)

THE PROBLEM

Where the margin actually leaks

None of this shows up as a single line item. It shows up as a slightly worse month, every month.

Rushed reorders

Placing a panic order at twice the price because nobody was watching the reorder point.

Dead stock

Cash sitting in a warehouse instead of in ads, because last quarter's forecast was a guess.

Manual spreadsheets

A different formula in every tab, and nobody fully trusts the number it spits out.

Why 3,400+ operators downloaded this

3,400+
Downloads since launch
28
Pages, no filler
6 min
Average read time
₹0
Cost, always

From an actual reorder mess

“We were placing emergency air-freight orders every six weeks. The buffer rule in chapter two alone cut that down to twice a year.”

Priya Menon

Priya Menon

Founder, Kavani Home

Don't let another quarter go by guessing

400+ D2C operators already have their copy. Yours is thirty seconds away.

Get the guide