A 5 kW rooftop system on a Pune bungalow generates about 620 units a month. At current MSEDCL residential slabs that is ₹9,400 you stop paying — for the next 25 years.
From the first survey to the day your meter starts running backwards. We publish the timeline because everyone else says "4 to 6 weeks" and means eleven.
A shade analysis on your actual roof, not a satellite guess. You get the generation estimate and the exact panel layout in writing.
We file the MSEDCL net-metering application and the national subsidy claim. You sign twice; we handle the other nine forms.
Two days on site. Mounting structure is hot-dip galvanised and wind-rated to 180 km/h, which matters more in Pune than anyone tells you.
The discom replaces your meter with a bidirectional one. Export credits start the same day. We attend the inspection with you.
We have filed 610 of these. The median time from commissioning to money-in-account is 47 days.
“Three quotes said 6 weeks. Sollum said 41 days and did it in 38, including the meter swap. First full month the bill was ₹214 instead of ₹9,800.”
Girish Kulkarni
Baner, Pune · 5.4 kW installed March 2026
Forty minutes on your terrace, a shade study, and a written generation estimate. No obligation and no salesperson in the car.